Iron & Steel
Description
Professional punched stainless steel scaffolding ladder plank machine
Scaffolding, also
calledscaffoldorstaging,is atemporary
structureused to support a work crew and materials to aid in the
construction, maintenance andrepairofbuildings, bridges and
all other man made structures. Scaffolding is also used in adapted forms for
formwork and shoring, grandstand seating, concert stages, access/viewing
towers, exhibition stands, ski ramps, half pipes and art projects (quotoed from
wiki). Now the metal ladderscaffoldingfor concrete slab and masonry
construction, here are some drawing profile and finsihed product pictures for
your reference:
Advantage of our
Professional punched stainless steel scaffolding ladder plank machine:
Professional punched stainless steel scaffolding ladder plank machine:
1. Rollforming Mills For Scaffolding Springboards is controlled by PLC control system ,during normal work,it will more security.
2. The basic of Scaffolding Board Making Machine is middle plate,it will be welded and tempering to avoid the distortion.
3.The frame of machine is iron structure,it will tempering.After this process, it will more strong and long life.
4.Transmission structure for the gear box. Each rack has a gear box molding can ensure that equipment over time, high-intensity running, and long service life.
Basic information of
Professional punched stainless steel scaffolding ladder plank machine:
Professional punched stainless steel scaffolding ladder plank machine:
1,Working speed :2-8 m/min
2,Material thickness :1.0-1.2mm
3,Control system:PLC
4,Decoiler :5T
5,Punching :one set
6,Main roll forming rollers:16row rollers
7,Roll material:GCR15 Steel after quenching process HRC58-62℃,he chrome plating surface treatment
8,Material of the shaft and the shaft diameter:45# steel processing, shaft diameter is 70mm
9,Main machine power :18.5kw
10,Hydraulic station power:5.5kw
11,Hydraulic pressure:24Mpa
12,Scissors punching material:Cr12Mov,Quenching HRC 58-62℃
13,Length tolerance:3m±1.0mm
14,Voltage :380V, 50HZ,3 phrase
15,driving mode :chain driving mode
16,Machine size :16.5*2.2*1.6m
17,Delivery date :30 working days
Accessories:
1.Easy damaged parts: conk 2 pcs, fuse-link 4 pcs
2. Rubber mat 1 pcs; 3.Bolt spanner 1 pcs
19,Payment terms: Payment: 30% T/T in advance and balance 70% after, Inspection confirmation before shipment.
Delivery: within 45 working days after receipt of deposit
Professional punched stainless steel scaffolding ladder plank machine
Professional punched stainless steel scaffolding ladder plank machine
Feeding and punching:
Roll forming for Rollforming Mills For Scaffolding Springboards:
Cutting part:
The final product of Scaffolding Springboards for you reference:
Read More
Cangzhou Zhongtuo cold bending forming equipment manufacturing co., LTD
Cold Roll Forming Machine,Color Steel Roof Machinery,Steel Frame Forming Machine,Welded Tube Mill Making Machine,Welded Pipe Machine,Roof Tile and Steel Frame
Address: Room 807, Building 6, Taida International,Yunhe district, Cangzhou City, Hebei province, China ,
Cangzhou, Hebei
China,
Tel: 0086-317-2191158
Fax: 0086-0317-5206880