Power Transmission Equipment
Description
PS:PID control for pump
P01.01--1 Terminal
P01.03--5 PID control
Downhole sensor connect to terminal AI1 and GND of VFD.
(Connecting PS: 24V with COM ,10V with GND)
(Analog input: AI1 as default as voltage signal, AI2 as default as current signal)
P01.09 Minimum running frequency
P01.11 accelerate time
P01.12 decelerate time
P06.00 . DI1 and COM connecting for start signal
PID control
P10.00 Given power supply of PID
P10.01 Keyboard presetting percentage of PID
P10.02 PID feedback source (According to voltage(V) or current(mA)signal)
P14 is the sleep and waken up function for water supply.You can choose it or not.
Read More
Shenzhen Powtech Co.,Ltd
POWTECH , Showyee Shu, variable frequency inverter
Address: No.233 Xixiang Avenue ,Baoan District,
Shenzhen, Guangdong
China, 518102
Tel: 0086-755-27586830
Fax: 0086-755-29960597