Boilers & Power Equipment
Description
Oil water well workover rig 900 oil well drilling rig for oilfield XJ75 (50t)?
?
Description:
?
XJ75 workover rig is rated as the China Top Brand of Oilfield Equipment by SINOPEC and CNPC. Mounted on truck type chassis, the rig features great mobility and high speed, which are perfect for workover service under complex ground/geological condition such as mountain and desert area. The XJ75 rig can perform workover duty up to 3,000m and 50tons.
?
Specifications :
?
?
- - - -
Workover Depth | 2,600m (8,530ft, 2-7/8& acute;& acute; DP) |
1,200m (3,940ft, 4-1/2& acute;& acute; DP) |
Serving Depth | 3,600m (11,800ft, 2-7/8& acute;& acute; EUE Tubing) |
Max. Hook Load | 750 kN (168,600lbf) |
Rated Hook Load | 500 kN (112,400lbf ) |
Chassis Engine | Model: WP10.336?Power: 247kW(330hp)/2,200rpm |
Rig Engine | Model: CAT C9?Power: 261kW(350hp) /2,200rpm |
Transmission | Allison 4700 OFS | Allison 4500 OFS |
Drawwork Drum | Φ406×800mm (Φ16& acute;& acute;×31.5& acute;& acute;) |
Mast Height | 28.5 m (93.5ft) | 21 m (69ft) |
Traveling System | 4×3 (Φ26mm (1& acute;& acute;) Wireline) | 5×4 (Φ26mm (1& acute;& acute;) Wireline) |
Hook Hoisting Speed | 1-1.5m/s (0.3-4.9ft/s) |
Overall Dimension (L×W×H) | 16.4×2. 5×4.3 m (53.8×8.2×14.1ft) | 14.5×2.5×4.20 m (47.6×8.2×13.8ft) |
Weight | 36,000 kg (79,400 lb) | 31,000 kg (68,300 lb) |
Chassis | North Benz ND2310G41J (8×8) | Steyr SX1315TT465 (8×4) |
- - - -
?
?
Read More
Beijing Ocean Renda Petroleum Equipment Co., Ltd.
Oil Drilling Rig,Workover Rig,Oil Drilling Tools
Address: Room 408锛?09, China Supply and Marketing Cooperative Foreign Trade Building, No.1 Shui鈥檃n South Street, Chaoyang District, Beijing, China.,
Beijing, Beijing
China, 100000
Tel: 86-010-84828178
Fax: 86-010-84828198