Industrial Washing Machine

Share us

Steel segmental bridge construction / bridge deck formwork Assembling custom

BCF-001

Description

bridge formwork segment
Specifications:

bridge deck formwork

mivan aluminium formwork

permanent formwork systems



Permanent Bridge Deck Formwork for Preformed Unit


Description:

1. Brief introduction

GB system-B is a kind of formwork especially for performed box girder in bridge floor construction.


2. Competitive advantage

①. Assembling is easier makes high construction efficiency.

②. Pouring object surface is smooth and beautiful.
The formwork is made of steel material with higher load bearing capacity and stronger stiffness that makes perfect surface on concrete.

③.Good economic performance

The cost will be greatly reduced by its long service life and more turnover times.

cheap prodocuts, china suppliers,

Read More

Previous

15KW TBM tunnel boring machine 250mm - 5000mm for Tunnel construction...

Previous

Customized Casting Iron Scaffolding Part Anchor Plate Or Tie Rod Nut For Formwork Systerm...

Global supply chain CO.,LTD.

Casting Iron,Steel Castings,Precision Investment Casting

Address: NO.130302,Tower1 Wangjing SOHO Business Center,
Beijing, Beijing
China, 100000

Tel: 86-010-57076748
Fax: 86-010-57076748

H5响应式定制设计
26种语言,SEO营销型网站


H5/响应式/营销型企业网站; 26种语言扩展;
覆盖: 英文、法语、德语、西班牙语、葡萄牙语、俄语、阿拉伯语、波斯语、日语、韩语
了解更多