Welding & Solders
Investment Casting Service / Engineering Part / Stainless Steel Casting Parts
Investment Casting Part-2015019
Description
?
Investment Casting Service / Engineering Part / Stainless Steel Casting Parts
?
?
Quick Detail:
?
·???????? Investment casting part of Valve Fitting?parts ;
?
·???????? Casting process : lost wax method ;
?
·???????? Material : SUS 304?;
?
·???????? Finish : Sandblasting;
?
·???????? ISO 9001 :?2008?certificated ;
?
·???????? Chemical composition tested by German spectrometer ;
?
·???????? NDT (X rays, Dye test etc) available .
?
·???????? Weight : 0.02-50?kg .
?
?
?
Description:
?
Stainless steel and carbon steel investment casting using precision investment casting process. The investment casting foundry is certificated with ISO9001, PED/AD2000. Industrial involved:valves, pumps, pipe fittings,machine components and other mechanical parts.
The most common material that Winnington cast:
- - - -
Stainless Steel (70%) | Carbon Steel (20%) | Alloy Steel (10%) |
CF8M (SS 316),?CF3M (SS 316L), ?CF8 (SS 304),CD4MCu, CD4MCuN,ANC20,1.4408,1.4517, 1.4581, 1.4306, 303,? 430, 420, 17-4PH, SCS1?
and more | SCS14,?SCS16, ?SCS13, 1.0619, WCB, S355JR, 1045 , LCC?
and more | CLA12C,?ANC2,42CrMo,7Q, 8Q,4140,6150?
and more |
- - - -
?
?
FAQ
1.?How long?can I get the price?
?
Prices will be quoted?within 24 hours after we get your inquiry with?detailed information?( including drawings, material, surface treatment,quantity, special requirements,etc).
?
2. How can I get a sample to check your quality?
?
On the case of quotation confirmation.Sample?will be?free of charge for customer approval, freight collect.
?
3. How long can I expect to get the sample?
?
It depends on, normally?15 days~30 days (including mould making time). Samples will be shipped by?DHL, FedEx, UPS, TNT or EMS,ect.
?
4. What about the leading time for mass production?
?
It depends on the order quantity. Normally,?15~40 days after receiving?of deposit or L/C.?
?
5. What is your MOQ?
?
We don& acute;t have a strict limit, small quantity is also workable.
?
?
Advantages:
?
Capacity
we can put your project on the right machines with the right expertise to give you a?quality product on time.
?
Speed
We consistently provide the fastest quotes quotes offered on the industry for machined parts.Our production?speeds are beyond compare with many machining jobs being programmed?and started on a CNC center the?same day the order is received.
?
?Post Processing
Post processing is a standard part of what solid concepts offers.we won& acute;t leave you?with?an?unfinished part that you have to send out for secondary operations.We offer?anodizing,hand polishing,helicoils,tapping, shot blasting and ?so on. we can be?your one-stop shop for impeccably finished CNC protype parts.
?
?
Quality
Quality you can count on from the leading experts in the rapid manufacturing?industry.whether you are doing CNC work to create master patterns,or limited-run production work,our expert team is here to help you?get the job done right!
Read More
NTCMACHINE LIMITED
Investment Casting Part,Steel Investment Casting,Stainless Steel Casting
Address: No.308, LinSheng RD, TingLin Industrial Zone,
Shanghai, Shanghai
China, 200000
Tel: 86-021-51001621
Fax: 86-021-60911231