Plastics & Products
Description
FRP SOCKETED TANK HEAD WITH FITTINGS
LINER CONSTRUCTION:
hand lay-up, c-veil+nexus+2mat.
STRUCTURE LAYER CONSTRUCTION:
hand lay-up by mat and woven roving, filament winding.
SOCKET:
be machined according to cylinder diameter and thickness.
FITTINGS:
required fittings are installed accurately and firmly.
SHAFT BED:
if cylinder is rolled by sheet, shaft bed will be equiped for next filament winding process.
shaft bed can be replaced by flange or manway.
APPLICATION:
quickly construct FRP tank or silo by quick bonding cylinder to head with the help of socket.
Read More
Holly Composites & Plastics Limited
FRP pipe fitting
Address: No.2, Zhendong Industry Zone, Sancang Town, Dongtai County,
Yancheng, Jiangsu
China, 224231
Tel: 8651585624589
Fax: 8651585624545