Machinery & Equipment
Description
The process of keg filling is CO2 injection and beer filling. When the keg is full, the machine will stop automatically.
Item Parameter
Filling Heads One head
Production capacity 10-30kegs/hr
Size of plateform 500*600mm
Overall size 560*600*1460mm
Weight 100kg
Rate of beer waste Less than 1%
Material SUS304
Kegs size 2-50L stainless steel and plastic kegs
Read More
Shandong HG machinery company
beer filler
Address: Jinan, Shandong,
Jinan, Shandong
China,
Tel: 0086053186418888
Fax: