Boilers & Power Equipment
High Efficiency Foam Crush Cutting Machine For Fillings Pillow / Sofa / Toys
QHZS-Q1 /Q2
Description
crush waste foam into pieces for fillings of pillow,sofas and toys foam crush cutting machine
?
Product Description
?
[Equipment features]
?
QHZS-Q1 /Q2 foam crush machine
# Used to crush waste foam into pieces
# For the fillings of pillows,sofas and toys
The machine is mainly used to crush waste foam into pieces for the fillings of pillows,sofas and toys,it also used to produce recycled foam,it has compact structure and high productivity.
QHZS-Q1
(1) Breaking speed 130kg/h
(2) Breaking particulate min 3mm~20mm
(3) Machine external size L2930×W1100×H1070mm
?
QHZS-Q2
(1) Breaking speed 100~130kg/h
(2) Breaking particulate min 3mm~20mm
(3) Screen 3pcs(8mm , 18mm , 30mm)
(4) Fan machine 4KW 1set
(5) Machine external size L2930×W1100×H1070mm
?
[Specifications]
?
- - - -
Model | QHZS-Q1 | QHZS-Q2 |
Breaking speed | 100kg/h | 100-130kg/h |
Breaking particulate min | 3~20mm | 3~20mm |
(8mm,18mm,30mm)Screen | / | 3pcs |
Fan machine (4kw) | / | ? |
Total power | 11kw ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?22kw |
Machine weight | 2000kg | 2200kg |
Machine external size | L1250×W570×H1250mm | L2930×W1100×H1070mm |
- - - -
?
?
Remark: The above only for reference. All the data is subjected to sold production.
?
?
The details:
?
? The machine ? ? ? ? Packing & shiping ?
How is the packing of the machine?
The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.
?
We will try the best way to pack all the machine well and also save the freight cost.
?
?
Our Services
?
We will help to design the layout of the machine that put in your factory.
We will send 2-4 experience engineers to install and testing the machines.
We will teach your engineer how to operate the machine and how to maintain the machines.
We will give you the machine operation manual and the best formulation for target products that you are going to make.
?
FAQ
?
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1?engineer help to install the machine you must send someone to help about 2?days installation will finished and?the machine can be running.
?
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
?
Q:What kind of raw material tools we need to prepare for the testing?
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
?
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.
?
Q:During the foaming if we have some problems abt the foam and the machine how can we do?
A: You can just call our after sale manager explain for the situation or send some pictures we will help to handle within 24hours.
?
?
You are warmly welcome come and visit our factory.
Read More
Dongguan Qianghui Foaming Machinery Technology Co., Ltd.
Foam Making Machine,Polyurethane Foam Machine,Low Pressure Foam Machine
Address: BaoAnWei No.1 Village,Gaobu Town,
Dongguan, Guangdong
China, 511700
Tel: 86-769-81302245
Fax: 86-769-81302246