? Product Description: ? ? ?
- - - -
(1) Simple Steel Construction |
Main structure | Single span: L -shorter than 18m, H -lower than6m |
Maintenance system | Roof | Colored sheet with 50mm glass wool |
Wall | Colored steel sheet |
Door | Wind resistance rolling door(within 10m2) |
Window | Very few |
Suitable market | No snow, wind load below 0.4kn/m2 |
- - - -

?

- - - -
(2) Standard Steel Construction |
Main structure | Single span: L -shorter than 24m, H -lower than8m |
Maintenance system | Roof | Colored sheet with 50mm glass wool |
Wall | Colored steel sheet or 50mm EPS sandwich board |
Door | Wind resistance rolling door(within 15m2) |
Window | Alu. Alloy (can use with skylight) |
Suitable market | Snow loading below 0.5kn,wind loading below 0.5kn/m2 |
- - - -

?

- - - -
(3) Coastal(High Wind Speed)Steel Construction |
Main structure | Single span: L -shorter than 18m, H -lower than 6 m |
Maintenance system | Roof | Colored sheet with 50mm glass wool |
Wall | Colored steel sheet or 50mm EPS sandwich board |
Door | Wind resistance rolling door(within 15m2) |
Window | Alu. Alloy (can use with skylight) |
Suitable market | Snow loading below 0.7kn,wind loading below 1.2kn/m2 |
- - - -

?

- - - -
(4) Cold Region(Heavy Snow) Steel Construction |
Main structure | Single span: L -shorter than 18m, H -lower than 6 m |
Maintenance system | Roof | Colored sheet with 50mm glass wool |
Wall | Colored steel sheet or 50mm EPS sandwich board |
Door | PU foamed rolling door |
Window | Alu. Alloy (can use with skylight) |
Suitable market | snow loads below 3kn, wind load below 1KN/M2 |
- - - -

?

- - - -
(5) Steel Construction with Crane(5T,10T,15T,20T) |
Main structure | Single span: L -shorter than 20m, H -lower than 10 m |
Maintenance system | Roof | Colored sheet with 50mm glass wool |
Wall | Colored steel sheet or 50mm EPS sandwich board |
Door | Wind resistance rolling door (within 15m2) |
Window | Alu. Alloy (can use with skylight) |
Suitable market | Snow 0.5kn, wind load below 0.5kn/m2 |
- - - -
? ? Steel Materials list ?
Bellow materials are general used in steel buildings , but we often customized each type depend on clients requirment .

?

?

?

- - - -
Item Name | Materials Characteristics | Material Grade | Surface Treatment |
Steel Column | H shape,Box,Steel Pipe,Hot tolled sheet | Q235B,Q345B | Paint or Hot dip Galvanized |
Steel beam | H shape,Box,Steel Pipe,Hot tolled sheet | Q235B,Q345B | Paint or Hot dip Galvanized |
Steel Bracing | Steel Rod,Steel Pipe,Angle Steel | Q235B,Q345B | Paint or Hot dip Galvanized |
Steel Purlin | C or Z purlins(Thickness1.8mm~3.0mm) | Q235B,Q345B | Hot dip Galvanized |
External Wall panels,Roof panels | Single colorful corrugate steel sheet,sandwich panels with EPS,Rock wool,PU. | Galvanized Steel+Painting | Alu-zin 150g,Fluorocarbon pain |
Steel buildings Door | Slidding or Rolling door | Steel or Aluminum sheet | Paint or Hot dip galvanized |
Steel buildings Windows | Aluminum alloy-Glass,Aluminum alloy-shutter | T=1.0-2.0mm | Alloy |
Skylighting panels | FRP T=1.5mm-1.8mm | Coefficient of thermal expansion:2.2x10-5/cm | Light Tranmitar 85% |
Ventilator | Turbine ventilator on a ridge | Steel,Stainless steel ,PC | Paint or Hot dip Galvanized |
Gutter | Galvanized steel plate,Stainless steel plate | T=2.0mm | Hot dip galvanized |
Downpipe | PVC pipe,color steelpipe Y=0.5mm | Dia110mm | paint |
Hight Bolt | Ordinary ,High strength | 10.9S,4.8S | Hot dip galvanized,Steel |
Ground bolts | Steel RodM24,M27,M30,M33,M39,M42 | 10.9S | Steel |
- - - -
? ? Steel&panels&sheets steel structure frame and roof panels/wall panels/accessories almost like them:

? ? Welded steel frame Welded steel structure frame/warehouse/workshop/Prefabricated house/storage/Meatal shed must have strict process and good qulity , than it is safe and long life .
1. Strictly control the welding position of the relative position of size , welding pass behind the prospective;

?

2. Reasonablly selection of welding parameters and order to prevent crack;

?

3. Electrode required drying, welding area need to clean up, welding process, together with the appropriate welding current, decrease of welding speed, gas completely escape , prevent the formation of weld porosity;

?

4. When continuously multi-layer welding, each weld layer after cleaning, prevent the formation of slag;

?

5. Selection for current, avoid arc pull too long, control electrode angle and arc method, avoid the generation of undercut.

Attached: welding process parameters

?

?

welding process parameters

?

- - - -
Materals(mm) | Electrode diameter (mm) | Welding current(A) | Welding voltage(V) | Welding speed(m/min) |
<10 | ?3.2 | 200-250 | 30-38 | 0.2-0.3 |
10-20 | ?4.0 | 200-250 | 30-38 | 0.15-0.25 |
>30 | ?4.0 | 320-350 | 30-38 | 0.3-0.5 |
- - - -

?


? ? Connected Detail ? ?
All steel structure warehouse,workshop ,storage ,steel prefabricated house , prefab home,prefab villas ,Steel Beams and Pillars connecteed Detail:

?

?



?

Steel Beams and Brace connected Detail:

?



?

?

Foundation Steel Ground bolts Detail :

?

?


? ?
Fast Quotations

?

Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced software we use.

?

Fast Delivery

?

(1) We are able to design, detail, fabricate and supply simple buildings in approximately 4 weeks.
(2) Most of our buildings are delivered and erected within 8 weeks (this relies on various factors such as stock position, weather etc).


Site Supervision

?

(1) A site supervisor is always present at site to ensure that work is being carried out satisfactorily.


(2) Any problems that arise are quickly dealt with to minimise any delays.


(3) Safety on site is also made a priority.

cheap prodocuts, china suppliers,

Read More

Previous

Industrial Construction Warehouse Steel Structure Factory Long Span Life...

Shenyang Zhongda Excellence Construction Engineering Co.,Ltd

Prefabricated Steel Structures,Workshop Steel Structure,Warehouse Steel Structure

Address: No.18, Xinghua North Street,Tiexi District, Shenyang,
Shenyang, Liaoning
China, 110000

Tel: 86-151-04005177
Fax: 86-151-04005177

H5响应式定制设计
26种语言,SEO营销型网站


H5/响应式/营销型企业网站; 26种语言扩展;
覆盖: 英文、法语、德语、西班牙语、葡萄牙语、俄语、阿拉伯语、波斯语、日语、韩语
了解更多